On Air Now David Francis 2:00pm - 6:00pm
Now Playing Shakira / Burna Boy Dai Dai

Victoria Marine Lake options report wanted by end of July 2027

The Constable of St Helier wants a report, setting out costed options for repairing and restoring Victoria Marine Lake, to be presented to the States by the end of July 2027.

The lake, also known as the West Park Bathing Pool, was opened in 1897 to commemorate Queen Victoria's Diamond Jubilee.

£315,000 was spent on bringing it back into full operation in 2014.

However, structural damage to the seawall has meant the pool has meant it hasn't held water at low tide since 2023.

More safety measures were then put in place earlier this year, after a child was pulled through a gap and swept out to sea.

Warning signs now tell people not swim in or walk around the lake.

More here: Jersey told to avoid Victoria Marine Lake after child pulled through seawall

The Infrastructure Minister told the States Assembly that they 'cannot rely on luck again', and that all options were being considered, including delisting and demolishing the Grade 4 structure.

More here: Demolition of Victoria Marine Lake would be considered

However, a long-term plan for its future has yet to be decided.

Deputy Jonathan Renouf has revealed, in response to a written question, that despite previous repair work, a void had formed under the wall and was growing.

Constable Inna Gardiner is bringing an amendment to the 2027 Budget, asking a sum to be set aside to produce a report with costed options. She says:

"For more than two years, the Assembly has been told that restoration of the Pool would be too expensive, that previous repairs have not worked and that the future of the Pool is uncertain. Yet no engineered assessment has been undertaken to understand what a lasting repair would involve or what it would cost.

"The Pool has served the Island for more than a century. Its recent failures have followed on from long periods of inadequate maintenance. That does not show that the structure cannot work. It shows that the question has never been properly answered. This amendment asks for that answer, so that the Assembly can decide on evidence rather than general statements. This is precisely why feasibility work is needed before substantial repair expenditure is committed."

If approved, nearly £28,000 would be ringfenced for officers to assess options for restoring and repairing the pool, and to give Ministers and the States Assembly 'sufficient evidence to decide whether full restoration is technically viable, financially proportionate, and capable of being delivered and maintained sustainably.'

Constable Gardiner says having the report ready by 31 July 2027 will also give States members enough time ahead of the 2028-2031 budget to consider any restoration funding.

Constable Gardiner added:

"This amendment does not seek funding for the repair itself. The cost of a lasting restoration is not yet known, and it would not be responsible to ask the Assembly to approve a figure that has not yet been established through proper assessment."

The funding would come from the 2027 Shoreline Management Plan feasibility allocation.

More from Jersey News

Island FM VIP

Get more with the Island FM VIP!

Just Played Songs